Contractor Information
In this section, contractors working at MACH 2024 can find key information relating to the show. If you have a technical query and cannot find the answer on this page, please email us and we will be happy to help.
Read-Only access to the Exhibitor Manual is available by Clicking Here but please be aware there is limited functionality on some forms unless you are logged in.
Timetable
Please find below the build schedule for MACH and ESC 2024
MACH ACCESS
DATE | ACCESS HOURS | COMMENTS | PPE* | |
TUESDAY | 09|04|24 | 0630 -2200 | Lifting Only – no stand construction permitted | PPE is required for admission, refer to the table below |
WEDNESDAY | 10|04|24 | 0630 -2200 | Lifting Only – no stand construction permitted | PPE is required for admission, refer to the table below |
THURSDAY | 11|04|24 | 0700 -2200 ____________ 1500 – 2200 | Lifting Only – no stand construction permitted Construction for stands over 150m² | PPE is required for admission, refer to the table below |
FRIDAY | 12|04|24 | 0630 -2200 | Lifting of exhibits and general stand construction. No access for shell scheme | PPE is required for admission, refer to the table below |
SATURDAY | 13|04|24 | 0630 -2200 ___________ 0800 -2200 | Lifting of exhibits and general stand construction. Shell scheme stands available for set-up** | PPE is required for admission, refer to the table below |
SUNDAY | 14|04|24 | 0630 -2200 | PPE is required for admission, refer to the table below |
ESC ACCESS
DATE | ACCESS HOURS | COMMENTS | PPE* | |
SUNDAY | 15|04|24 | 0630 – 2200 | Shell scheme stands available for set-up | PPE is required for admission, refer to the table below |
STOP THE DROP!
The MTA as the owners of MACH support the ‘Stop The Drop’ campaign designed to promote safe working practices when working at height. The Stop The Drop website contains, toolbox talks, information sheets and safety planning tools specifically tailored to exhibitors, organisers and contractors.
Please take a moment to review the information and resources available on the site and help us to ensure that everyone on site is safe whilst working at height.
Technical Plans & Specs
You can download a pdf of the exhibition’s technical plan by clicking Here.
Details of the standard shell scheme provided at MACH 2024 can be downloaded by clicking Here.
Download the MACH Stand Build Regulations Here.